Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Alternate Method Guideline (CE1103)

Guideline for submitting requests for alternate methods, code interpretations and modifications.

Last Updated: January 20, 2026

2021 Code Words

2021 Code Words provide interpretations, written policies, and procedures to aid in the application of construction code. 

Last updated: September 15, 2025

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

List of the Currently Adopted Construction Codes (CE1199)

List of the currently adopted codes.

Last updated: 03-07-2024

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

02893-02 Electrical Service Support Pedestal Service Type PS

02893-02 Electrical Service Support Pedestal Service Type PS

Updated 11-26-2023

02893-02_2023_11_MOD.dwg

02893-02 Electrical Service Support Pedestal Service Type PS

Updated 12-26-2023