Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Approved Fabricator Guidelines (CE1285)

The guide explains the requirements and procedures of the City of Houston-approved fabricator program. 

Last updated: February 20, 2026

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

List of the Currently Adopted Construction Codes (CE1199)

List of the currently adopted codes.

Last updated: 03-07-2024

Solicitud para la ocupacion, inspeccion de acatamiento (CE1045s)

Solicitud para la ocupacion, inspeccion de acatamiento (occupancy application in Spanish)

Last updated: January 2025

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 03/08/2024

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

17 Technical Memo, Social Stair Handrail Requirements.pdf

This technical memo is provided to describe the new changes to the Houston Construction Codes with regards to the amendment related to the requirements of Social Stair Handrail requirements.

 

Uploaded 2-13-2024

TxDOT Sanitary Sewer Details
Stationary Engineer License Requirements (CE1221)

Stationary Engineer License Requirements.

Last updated: February 2026