Use a mixture of filters or keywords to find documents and resources by department, type or topic.
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for a permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: January 2026
Form required to register or renew electrical licenses.
Last updated: January 2024
List of the currently adopted codes.
Last updated: 03-07-2024
Application required to renew City of Houston Special Inspector certification.
Last updated: June 02, 2025.
How to guide for purchasing a trade permit online through iPermits portal.
For Plumbing, Electrical and HVAC reinspections.
Guideline for submitting requests for alternate methods, code interpretations and modifications.
Last Updated: January 20, 2026
2021 Code Words provide interpretations, written policies, and procedures to aid in the application of construction code.
Last updated: September 15, 2025
Form for registering licensed elevator contractors with the City of Houston
Last updated: Jan. 10, 2024
This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.
Last Updated: 01/01/2023