Use a mixture of filters or keywords to find documents and resources by department, type or topic.

08C02 Commercial Wood Guardrail

08C02 Commercial Wood Guardrail Instructions

25-10-R Door Barrier Solid Mansory Wall Construction (Dangerous Building)

Last Updated: April 2025.

18-04-R Residential Garage Dwelling Separation
25-01-R Two family dwelling horizontal separation

Last Updated: January 2025

18-02-R Two family dwelling vertical separation

Two family dwelling vertical separation

22-04-R, 1-Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall)

1 Hour Fire-Rated Exterior Wall for Block & Base Foundations (Sub-floor Knee Wall) 

Revised 01/17/2023

Solar Ready Example DWG 22-01-R

This example drawing identifies what is needed on the roof plan to be compliant with the solar-ready provisions. This is drawing for reference only.

Last updated Jan. 17, 2023

12-08-R Example site plan for drainage requirements

Example site plan for drainage requirements.

04 Technical Memo, EV-Ready Appendices.pdf

This technical memo is provided to describe the new changes to the Houston Amendments to the 2021 International Energy Conservation Code (IECC) for Commercial and Residential provisions with regards to the requirement for EV readiness.  These changes provide options for builders and owners to provide EV-ready construction. 

 

Uploaded 02/13/2024

05 Technical Memo, Solar-Ready Appendices.pdf

This technical memo is provided to describe the new changes to solar readiness in the Houston Amendments to the 2021 Residential Code (IRC) and the 2021 International Energy Conservation Code (IECC). 

Uploaded 02/13/2024