Use a mixture of filters or keywords to find documents and resources by department, type or topic.

17 Technical Memo, Social Stair Handrail Requirements.pdf

This technical memo is provided to describe the new changes to the Houston Construction Codes with regards to the amendment related to the requirements of Social Stair Handrail requirements.

 

Uploaded 2-13-2024

WCR Shopping Center Application (UA008)

Wastewater capacity reservation application form for shopping centers.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026

List of the Currently Adopted Construction Codes (CE1199)

List of the currently adopted codes.

Last updated: 03-07-2024

List of Registered Independent Third Party Energy Technicians (CE-1406)

List of Registered Independent Energy Technicians.

Last Updated: February 18, 2026

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Wastewater Capacity Reservation Revision Application (UA007)

Request changes to your WCR letter.

Last updated: 05.19.2022. This document is maintained by Utility Analysis.

List of Registered Fabricators

The fabricators on this list have been certified by a third-party agency and approved by the City of Houston to produce or fabricate primary structural components for buildings.

Last updated: February 19, 2026

List of Registered Special Inspectors

List of approved special inspectors. 

Last updated: February 19, 2026

Application Authorization Form (UA002)

Authorizes an agent on behalf of owner.

Last updated: 08.26.2019. This document is maintained by Utility Analysis.

Last Update: 2.11.2020. Updated to require representative's signature.