Use a mixture of filters or keywords to find documents and resources by department, type or topic.

02741-01 Hot Mix Asphaltic Concrete Pavement Details

Hot Mix Asphaltic Concrete Pavement Details 

Updated 11/26/2023

Alternate Method Guideline (CE1103)

Guideline for submitting requests for alternate methods, code interpretations and modifications.

Last Updated: January 20, 2026

2021 Code Words

2021 Code Words provide interpretations, written policies, and procedures to aid in the application of construction code. 

Last updated: September 15, 2025

02775-05 Commercial & High Density Conditions Curb Ramp Details

Commercial & High-Density Conditions Curb Ramp Details

Updated 11-26-2023

02775-05_2023_11_MOD.dwg

02775-05 Commercial & High Density Conditions Curb Ramp Details

Updated 12-19-2023

02771-01_2023_11_MOD.dwg

02771-01 Curb, Curb and Gutter, and Header Details

Updated 12-19-2023

02775-02_2023_11_MOD.dwg

02775-02 Typical Curb Ramp Details

Updated 12-19-2023

02775-01_2023_11_MOD.dwg

02775-01 Typical Sidewalk Layout and Details for Streets with Curbs

Updated 12-19-2023

02754-04 Proposed Sidewalk Through Driveway with Minimal Elevation Difference

Proposed Sidewalk Through Driveway with Minimal Elevation Difference 

Updated 11-26-2023

02751-01 Concrete Pavement Details

Concrete Pavement Details 

Updated 11-26-2023