Use a mixture of filters or keywords to find documents and resources by department, type or topic.
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
Last Updated: June 20, 2025.
Easement dedication form for water meters (Form 584)
Complete this form when applying for a Certificate of Occupancy for existing buildings or lease spaces except for Live Work units and Residential Facilities. For these types of properties, please use form CE-1045B which includes a Deed Restriction Declaration.
Updated: December 2025
Deed restriction compliance declaration in support of a building permit application. To be signed by an individual owner.
Request changes to your WCR letter.
Last updated: 05.19.2022. This document is maintained by Utility Analysis.
Solicitud para la ocupacion, inspeccion de acatamiento (occupancy application in Spanish)
Last updated: January 2025
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: October 4, 2024
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024