Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Solar APP+ Application Guidelines_CE-1410

Last Updated: June 20, 2025.

Occupancy Application (CE1045A)

Complete this form when applying for a Certificate of Occupancy for existing buildings or lease spaces except for Live Work units and Residential Facilities. For these types of properties, please use form CE-1045B which includes a Deed Restriction Declaration.

Updated: December 2025

Declaration Supporting Building Permit Application - Individual (CE-1380)

Deed restriction compliance declaration in support of a building permit application. To be signed by an individual owner.

Solicitud para la ocupacion, inspeccion de acatamiento (CE1045s)

Solicitud para la ocupacion, inspeccion de acatamiento (occupancy application in Spanish)

Last updated: January 2025

14-03-R Single Family Residential Driveways Interlocking Concrete Permeable Paver and Flexible Plastic Grid Paver Systems

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

List of Boarding Homes and Lodging Facility Applications and Permits

List of boarding homes and lodging facility applications and permits issued.

Last updated: February 20, 2026.

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

Plan Review Prerequisites Checklist (CE-1427)

General prerequisite requirements for plan review. This form must be completed by the sign contractor.

Last updated: December 5, 2025