Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Current Groundwater Plant Design Guidelines

Current groundwater plant design guidelines (effective Oct. 1, 2021)

Last updated: July 1, 2021

2023 Division 02-16 Standard Construction Specifications

The 2023 edition of Division 02-16 Standard Construction Specifications

 

Last updated: November 21, 2023

Supplement to IDM Chapter 9 (May 16, 2025)

Last Updated: 05/16/2025

IDM Chapter 9 Storm Detention Supplement

This supplement modifies storm detention requirements in Chapter 9 of the Infrastructure Design Manual (IDM).

 

Last updated: March 17, 2021

2022 Division 01 General Requirements Specifications

The 2022 edition of Division 01 - General Requirements Specifications

 

Last updated: July 28, 2022

2023 Infrastructure Design Manual

The 2023 edition of the Infrastructure Design Manual (IDM) will go into effect on November 27, 2023

 

Last updated: November 21, 2023

2022 IDM Cover Letter and Executive Summary

Executive summary and cover letter for the 2022 edition of the Infrastructure Design Manual

 

Last updated: July 1, 2022

Harris County Records Memo

Memo for restrict flood bond projects to municipalities.

2023 Cover Letter & Executive Summary

2023 Cover Letter and  Executive Summary

Updated November 27, 2023

IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021