Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This form is to be completed by the applicant to obtain permits for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.
Updated: April 2024
Step by step guide for applying for a wastewater capacity letter online.
Last updated: January 18, 2022
Request for deferred plan submittal.
Last updated: June 02, 2025.
Last updated: 06/01/2022
How to guide for purchasing a trade permit online through iPermits portal.
Last Updated: August 2024
Electronic plan review user guide for electronic lock projects
A tool to assist in determining the amount of impervious area as a percentage on lots 15,000 square feet or less.
Last updated: 5.3.2021
Last Updated: May 2025.
This worksheet should only be completed to obtain permits for residential re-roof or roof repairs. Please note that this includes deck and covering but NOT rafters and/or joists.
Last updated: 10/09/2019