Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Residential One-Stop Guidelines (CE1050)

The Residential One-Stop Guideline lists the various requirements for plan submittal and review of residential construction projects.

Last updated: September 8, 2025

TxDOT Sanitary Sewer Details
Residential Repairs Permit Guidelines (CE1058)

Guidelines for applying for a residential repairs permit. Residential repairs permits are required for repairs that involve only replacement of existing structural members and other building elements.

Last updated: 12/28/2022

Swimming Pool Demolition Guidelines (CE1090)

The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.

Last updated: January 2026

Solar Photovoltaic Panel Permit & Inspection Guide and Checklist(CE1198)

This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.

Last updated: 03/25/2024

Building Code Design Criteria (CE1110)

Overview of Building Code Design Criteria

Last updated: May 22, 2025.

Specifications and Application for Securing a Vacant/Dangerous Building (CE1226)

Last Updated: May 2025

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Modular Building Submittal Requirements (CE1099)

To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review. 

Last updated: February 2024

Quick Start I Plan Review Procedures (CE1071)

To provide a means for expediting the plan review of large commercial design projects prepared by professional (licensed architect/engineer) designers, and which are ready for final plan re-submittal for minimal corrections. A paid review meeting may be scheduled to review corrections for permit issuance

Last updated: 08-02-2023