Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The Residential One-Stop Guideline lists the various requirements for plan submittal and review of residential construction projects.
Last updated: September 8, 2025
Guidelines for applying for a residential repairs permit. Residential repairs permits are required for repairs that involve only replacement of existing structural members and other building elements.
Last updated: 12/28/2022
The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.
Last updated: January 2026
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
Overview of Building Code Design Criteria
Last updated: May 22, 2025.
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
To provide a means for expediting the plan review of large commercial design projects prepared by professional (licensed architect/engineer) designers, and which are ready for final plan re-submittal for minimal corrections. A paid review meeting may be scheduled to review corrections for permit issuance
Last updated: 08-02-2023
Guidelines for completing Form 584 for General Utility Easement.
Senate Bill 509 requires municipalities to verify that an asbestos survey has been conducted prior to issuing renovation or demolition permits for public or commercial buildings, and affects renovation and demolition permits for public or commercial buildings issued by municipalities on or after January 1, 2002.
Last updated: 06/09/2022
The Commercial Plan Review process will enable your building and improvement plans to be reviewed for Houston Construction Code compliance prior to issuance of a building permit.
Last updated: 01/01/2023