Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Qualifications and procedures for storm drainage plan review virtual "walk-in" service. New guidelines are effective Jan. 30, 2023.
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
Procedures for obtaining a water main abandonment permit.
Last updated: 1/1/2019
Best management practices for cosmetic wash water.
Last update: 4/30/2008
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2024
Procedures for obtaining a permit to install or relocate a fire hydrant.
Last updated: 7/1/2017
POLICY CLARIFICATION DOCUMENT. 42‐156: Garage Building Line requirement for the side of corner lots in Extra‐Territorial Jurisdiction (ETJ)