Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

Informational Letter 0016-2009

Clarifications on permitting and engineering requirements for on-premise and off-premise signage

Building Demolition Guideline (CE1075)

Guidelines for applicants wishing to remove or demolish a building or structure from a property.

Last updated: January 2024

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019 

Extraterritorial Jurisdiction Plan Review and Submittal Requirements (CE1041)

Extraterritorial Jurisdiction “ETJ” is all unincorporated territory extending 5 miles beyond the corporate boundaries of the city limits of Houston as established by Chapter 42 – Texas Local Government code.

Last updated: 01/01/2022

Exhibit B 2018

Request for reimbursement of eligible storm sewer drainage costs.

Last updated: March 16, 2022

Roof Repair and Cool Roof Guidelines (CE1209)

The 2015 Houston Commercial Energy Conservation Code with local Amendments, effective December 9th, 2016, contains mandatory cool roofing provisions for new commercial buildings and alterations to existing commercial buildings.

Updated: 10/16/2019

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

Owners Annual Affidavit
Owners Original Affidavit