Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Service unit equivalent table for determining impact fees. (form UA005)
Last updated: May 20, 2021
Standard Details for Construction Services.
To define the minimum plan review requirements to obtain a building permit for the installation of a Modular or Prefabricated Building. Code requirements that apply to newly constructed buildings also apply to these prefabricated structures except state approved plans which are accepted without additional review.
Last updated: February 2024
Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
Last Updated: June 20, 2025.
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
Clarifications on permitting and engineering requirements for on-premise and off-premise signage.
Wall sign attachments