Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Cosmetic Wash Water Guidelines

Best management practices for cosmetic wash water.

Last update: 4/30/2008

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2024

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Electronic Lock Plan Submittal Checklist (CE1337)

Checklist of plan review requirements for electronic locks.

Last updated: 11/18/2019

42‐156: Garage Building Line Requirement

POLICY CLARIFICATION DOCUMENT. 42‐156: Garage Building Line requirement for the side of corner lots in Extra‐Territorial Jurisdiction (ETJ)

Additional TIA Requirements Guide
Blank SWQMP Checklist
Approved Storm Water Product List

Posted on May 6, 2021.

SWQ Guidance Manual
Checklist For Infrastructure Acceptance