Use a mixture of filters or keywords to find documents and resources by department, type or topic.

19-04-M One Hour Exterior Wall Membrane Penetration

The following drawing is an example of typical construction and can be used as a reference.

NOTE: This is not an engineered drawing.  

Street and Bridge Notes

Construction notes for streets and bridges

Last updated: Feb. 3, 2023

K-Series
15-02-C 2 Hour Fire Wall
01580-03 Construction Sign (DWG)
COH Standard Symbols
CP General Notes (DWG)
Example Bore Hole Logs (.pdf)
H-Series
TTC-2