Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Step by step guide for applying for a wastewater capacity letter online.
Last updated: January 18, 2022
Builder's bond for sidewalk, driveway, curb and gutter. Bond period of less than one year.
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
List of the currently adopted codes.
Last updated: 03-07-2024
Request for deferred plan submittal.
Last updated: June 02, 2025.
A general overview of the residential building permit process. This presentation will outline the basic steps involved in submitting plans for review, obtaining permits, and scheduling inspections for one and two-family dwellings.
Last updated: 5/22/2023
The Residential One-Stop Guideline lists the various requirements for plan submittal and review of residential construction projects.
Last updated: September 8, 2025
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
Updated: 06/05/2024
Guide explains the process for canceling abandoned projects numbers and permits.
Last updated: February 2024