Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The guide explains the requirements and procedures of the City of Houston-approved fabricator program.
Last updated: February 20, 2026
This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.
Last updated: Nov. 17, 2022
This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.
Last updated: Nov. 17, 2022
Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.
Updated: October 4, 2024
Registration & Renewal Process for State Air Conditioning Licenses.
Last updated: 03/08/2024
This is a guide to assist in the plan review, permit, and inspection process for the installation of a solar panel system. The required components to be included in drawings to obtain permits, and the items that the city inspectors will be verifying in the field during the inspection process are included.
Last updated: 03/25/2024
Storm plan review checklist for residential projects with tract size of less than 15,000 square feet
Last updated: Feb. 17, 2022
Stationary Engineer License Requirements.
Last updated: February 2026
The following detail and specifications, issued in conjunction with the Department of Neighborhoods and Health Department, identifies requirements for the demolition of swimming pools and spas; including, but not limited to, pools determined to be in violation of the City of Houston Minimum Standards or Dangerous Building Ordinance.
Last updated: January 2026