Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Trabajos de reparacion residencial de danos por tormentas

Storm damage repair guidelines for single-family homes and duplexes in Spanish.

Last updated: 9/20/2017

ERRC Initial Grid Test Report (Pre-test) (CE-1386)

The Emergency Responder Radio Coverage (ERRC) Initial Grid Test Report (Pretest) form is used to check for radio coverage in a building to determine if the building has the radio coverage required by code, or if a Bidirectional Antenna System is needed to be installed in the building to boost the signal and enhance the coverage to meet the code.

 

Revised 08/15/2023

Sizing of Heating and Cooling Equipment and Ducts - Commercial (CE1300)

This form shall be completed and submitted to the field inspector for the following commercial projects: new construction, additions, complete remodels, and complete new ac systems.

Last Updated: 01/01/2023

CE_1091 Model Home Brochure

Last Updated: 9.14.22

House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 12-11-2023

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

Occupancy Inspections for Existing Buildings (CE1278)

This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.

Last updated: 2/12/2019

Manufactured Homes brochure (CE1289)

This guide provides the requirements for the placement and reconnection of manufactured homes.

Last updated: 01-01-2024

Overview of the General Commercial Permit Process (CE1279)

This brochure is intended to provide a very high level overview of the commercial building permit process.

Last updated: 1/1/2019

Mechanical Inspection Request Form for Occupied Residences (CE1048)

This form is to be used for occupied residences only. Form must be received at least one day before the requested inspection date.