Use a mixture of filters or keywords to find documents and resources by department, type or topic.

22-05-R, 1-Hour Fire-Rated Wood Stud Exterior Wall

1 Hour Fire-Rated Wood Stud Exterior Wall

Revised 01/17/2023

Registration Process for Electrical Master and Contractor (CE1203)

Registration & Renewal Process for Electrical Master & Contractor.

Last updated: January 2024

iPermits Reference Guide for Sign Administration

Quick reference guide for the iPermits online portal for Sign Administration users.

01512-01 to 01512-12 Traffic Control
  • TCP Notes Channelizing Device and Barricades
  • TCP Overall Traffic Control Layout
  • Traffic Control Layout
  • TCP One Lane Closure Phase 1 & 2
  • TCP One Lane Closure
  • TCP Typical 3-Way Intersection Phase 1 of 3
  • TCP Typical 3-Way Intersection Phase 2 of 3
  • TCP Typical 3-Way Intersection Phase 3 of 3
  • TCP 4-Way Intersection Phase 1 of 4
  • TCP 4-Way Intersection Phase 2 of 4
  • TCP 4-Way Intersection Phase 3 of 4
  • TCP 4-Way Intersection Phase 4 of 4
  •  
02752-02 Sidewalk Expansion and Construction Joint Details

Sidewalk Expansion and Construction Joint Details 

Updated 11-26-2023

Application for Dangerous Building Compliance Inspection (CE1262)

The application must be completed when a building has been declared a dangerous building and required to be repaired by a Hearing Order. 

Last Updated: January 2026

02511-01 Typical Pipe Offset Section For Water Mains
Residential Facilities Permitting Process Overview

Overview of the permitting process for boarding homes, lodging facilities, alternate housing facilities, and correctional facilities.

 

Last updated: January 7, 2022

01580-01_2023_11_MOD.dwg

1580-01 DWG file uploaded 12-12-2023

COH-TB-STD_ANSI_B Mod.pdf

City of Houston Standard Detail Title Block - ANSI B (17 x 11 inches) uploaded 12-12-2023