Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Request changes to your WCR letter.
Last updated: 05.19.2022. This document is maintained by Utility Analysis.
Authorizes an agent on behalf of owner.
Last updated: 08.26.2019. This document is maintained by Utility Analysis.
Last Update: 2.11.2020. Updated to require representative's signature.
Builder's bond for sidewalk, driveway, curb and gutter. Bond period of less than one year.
For shopping center with excess capacity.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
Service unit equivalent table for determining impact fees. (form UA005)
Last updated: May 20, 2021
Annual Electrical Maintenance Repair Permit Application
Last Updated: January 2026
Wastewater capacity reservation application form for shopping centers.
Last updated: 10.25.2019. This document is maintained by Utility Analysis.
Exemption form for low and moderate-cost single-family housing.
Effective: February 1, 2026
Procedures for requesting a contractor name change or address change on an existing building permit.
Last updated: January 2026
Last Updated: May 2025