Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Approved Water Product List

Approved water products by the Design and Construction Standards Group

Last updated: September 30, 2025.

16124-03 Complete Utility Locating System Hydrant Detail

2021 Detail for 16124-03 Complete Utility Locating System Hydrant Detail (effective October 1, 2021)

 

Last updated: July 6, 2021

02951-01 to 02951-03

02951-01 Street Cut Replacement Concrete Less Than 5 Years Age

02951-02 Street Cut Replacement Concrete Over 5 Years Age

02951-03 Street Cut Replacement Asphalt Pavement of All Ages

02082-12 Storm Sewer Type C Precast Box Manhole

Drawing 02082-12 Storm Sewer Type C Precast Box Manhole (effective November 27, 2023)

 

Last updated: November 26, 2023

00612 One Year Maintenance Bond
00610 Preformance Bond

Last Updated: February 2026

00611 Statutory Payment Bond

Last Updated: February 2026

00010 Table of Contents

Table of contents for all of the City of Houston standard documents for construction.

Last update: February 2026

00821 Wage Scale For Building Construction

Wage scale and payroll requirements for building construction

Last updated: Feb. 2026

00820 Wage Scale For Engineering Construction

Wage scale and payroll requirements for engineering construction

Last updated: Feb. 2026