Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Office of the City Engineer Plan Review User Guide (English)

Last Updated: August 2024

Storm Detention Requirements Frequently Asked Questions (March 12, 2021)

Frequently asked questions about changes to the storm detention requirements in Chapter 9 of the Infrastructure Design Manual (IDM).

 

Last updated: March 12, 2021

IDM Chapter 9 storm detention cover letter

Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.

 

Last updated: January 26, 2021

00110 City Engineer
00653 Contractor Performance Evaluation
00498 Notice of Intent To Award
COH Plot Table

Plot Table

00802 SRF Supplementary Conditions

Updated: Oct. 2024

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019 

2019 Infrastructure Design Manual

The 2019 version of the Infrastructure Design Manual (IDM)