Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Office of the City Engineer Plan Review User Guide (English)
Last Updated: August 2024
Storm Detention Requirements Frequently Asked Questions (March 12, 2021)
Frequently asked questions about changes to the storm detention requirements in Chapter 9 of the Infrastructure Design Manual (IDM).
Last updated: March 12, 2021
IDM Chapter 9 storm detention cover letter
Cover letter explaining the supplemental changes made to Chapter 9 of the Infrastructure Design Manual.
Last updated: January 26, 2021
00110 City Engineer
00653 Contractor Performance Evaluation
00498 Notice of Intent To Award
Guidelines for a Successful Mylar Walk Through
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
2019 Infrastructure Design Manual
The 2019 version of the Infrastructure Design Manual (IDM)