Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Surface Restoration Bond

One year surface restoration bond - informal contract

This document is maintained by Taps & Meters.

Fire Marshals Office_Houston Fire Department_Presentation_11.19.2024

This presentation was delivered at the Houston Permitting Center Annual Workshop on November 19, 2024.

Updated: 11.19.2024

Sponsor Change Form

Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)

Fire Access Gate Checklist

Last Update: 5/21/2024

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Updated: November, 2025.

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.

Large Meter Permit Requirements

Permitting requirements and procedures for obtaining large water meter permits.

Last updated: 10/14/2021

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017