Use a mixture of filters or keywords to find documents and resources by department, type or topic.

00001 Front Page for Project Manual
02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger

2021 Detail for 02517-01 LDWL Tunnel and Casing Details for Water Lines 24-Inch and Larger (effective October 1, 2021)

 

Last updated: July 6, 2021

00604 History Of OSHA Actions And List Of On The Job Injuries
Analysis of Impervious Cover (OCE0003)

This form must be completed for all projects (commercial and residential).

Last updated: 2/4/2020

Stormwater Information Form

The Office of the City Engineer reviews and approves development plans to ensure the proper design and construction of storm sewer utilities. This form is required when a property owner proposes new development or redevelopment of the property.

Last updated: 8/02/2022

IDM Chapter 9 Storm Detention Supplement

This supplement modifies storm detention requirements in Chapter 9 of the Infrastructure Design Manual (IDM).

 

Last updated: March 17, 2021

00570 Contractors Revised MWSBE Participation Plan

Last update: January 21, 2022

00041 List of Prequalified Asbestos & Lead Abatement Contractors
00521 Assignment
Sign Administration Business Name Change Form (CE_1425)

Sign Administration Business Name Change Form

Updated: October 2025