Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Easement dedication form for water meters (Form 584)
International Energy Conservation Code Amendments (IECC)
Updated August 17, 2023
The 2021 International Fire Code was adopted on October 25, 2023, and became effective on January 2, 2023.
Last updated: December 26, 2023
Permitting requirements and procedures for obtaining large water meter permits.
Last updated: 10/14/2021
The Houston Fire Department's Life Safety Bureau Standard 09 - Marking of Fire Hydrants.
Last updated: 04/26/2022
The Houston Fire Department's Life Safety Bureau Standard 08 - Fire Drills.
Last updated: 04/26/2022
Procedures for obtaining a permit to install or relocate a fire hydrant.
Last updated: 7/1/2017
Procedures for obtaining a water main offset permit.
Last updated: 1/1/2019
Application for large meters.
Last updated: 6/13/2022
The Houston Fire Department's Life Safety Bureau Standard 02 - Inspection and Testing of Fire Protection and Life-Safety Equipment
Last updated: 04/26/2022