Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Builder's bond for sidewalk, driveway, curb and gutter. Bond period of less than one year.
One year surface restoration bond - informal contract
This document is maintained by Taps & Meters.
Procedures for requesting a contractor name change or address change on an existing building permit.
Last updated: January 2026
Open records request form for Houston Permitting Center service lines only (form HPC-0001). For other city departments, please visit https://www.houstontx.gov/pia.html.
Last updated: 03/01/2022
Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.
Easement dedication form for water meters (Form 584)
Last Updated: May 2025
Procedures for obtaining a small water meter.
Last updated: June 7, 2022
Application to request a contractor name change or address change on an existing building permit.
Last updated: January 2026
Checklist for obtaining approval on easement surveys.
Updated: November, 2025.