Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Updated: November, 2025.

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)

Texas Public Information Act Request Form

Open records request form for Houston Permitting Center service lines only (form HPC-0001). For other city departments, please visit https://www.houstontx.gov/pia.html.

Last updated: 03/01/2022

Large Meter Permit Requirements

Permitting requirements and procedures for obtaining large water meter permits.

Last updated: 10/14/2021

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Large Job Application - Meters

Application for large meters.

Last updated: 6/13/2022

Sponsor Change Form

Sponsor change form for small water meters between 5/8-inch and 2-inches in size.
Last update: 03/01/2024.