Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Guidelines for a Successful Mylar Walk Through

Guidelines for a successful mylar walk through.

Last updated: 12/6/2019 

2019 Infrastructure Design Manual

The 2019 version of the Infrastructure Design Manual (IDM)

12-07-R Flitch Plate Beam
Third Party Review/Inspection of Backup Power Installations (CE1416)

Last Updated: September 26, 2025

00932 Request For Proposal
00496 Control Form For Contract Documents
List of Registered Solar App+ Companies

List of companies that are authorized to use Solar App+ to obtain permits for Solar Projects.

Last Updated April 2, 2025.

CCM TTI Committee - 08.24.2023

HOUSTON CONSTRUCTION CODE MODERNIZATION 2021 BUILDING CODE ADOPTION PRESENTED TO: Transportation, Technology, and Infrastructure Committee August 24, 2023

Updated October 10, 2023

00251 Prebid Meeting Agenda
11 Technical Memo, Atrium-Means of Egress and Separation Requirements.pdf

This technical memo is provided to describe the significant changes to the Houston Construction Codes with regards to the requirements of an Atrium’s means of egress and separation requirements. 

 

Uploaded 2-13-2024