Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Prescriptive Method: R-Value Computation (CE1415)

Last Updated: August 20, 2025.

11-02-M Concrete Retaining Wall
Calculation of Impervious Percentage (CE1207)

A tool to assist in determining the amount of impervious area as a percentage on lots 15,000 square feet or less.

Last updated: 5.3.2021

00700 General Conditions

Updated: Oct. 2024

Residential Repair Spec List (CE1059)

This form is to be completed by the applicant to obtain permits for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.

Updated: April 2024

iPermits How to Purchase a Trade Permit

How to guide for purchasing a trade permit online through iPermits portal.

Post Install Solar Inspection Letter (CE-1387b)

This is an example inspection letter for a Solar APP+ project. For an example of a typical solar panel system, refer to form CE-1387a.

Last updated: Nov. 17, 2022 

SOLAR APP+ PERMIT IPERMITS HOW-TO-GUIDE (CE_1413)

Last Updated: May 2025.

Post Install Solar Inspection Letter (CE-1387a)

This is an example of an inspection letter for a typical solar panel system. For a Solar APP+ project, refer to form CE-1387b.

Last updated: Nov. 17, 2022

2021 Division 02-16 Standard Construction Specifications

2021 edition of the Standard Specifications