Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Wastewater Capacity Reservation Site Transfer Application (UA004)
Transfer capacity to another site within the same treatment plant. (form UA004)
Last updated: 07.20.2019. This document is maintained by the Utility Analysis.
Application for Permit to Construct Stormwater Lines Systems (OCE-2002)
Updated: January 2026
Impact Fee Administration WCR_Presentation_11.19.2024
This presentation was delivered at the Houston Permitting Center Annual Workshop on November 19, 2024.
Updated: 11.19.2024
Bond in Connection with Permit to do Work in a Street in the City of Houston (OCE-2003)
Updated: 09/11/2025
REVISION AND UPDATE SIGNATURE TEMPLATE GUIDE