Use a mixture of filters or keywords to find documents and resources by department, type or topic.

COMcheck Public Workshop Presentation Slides

Presentation slides from the 2015 IECC COMcheck public workshop on September 16, 2020.

Shopping Center Approval Denial Letter Application (UA009)

For shopping center with excess capacity.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Impact Fee Exemption Form (UA006)

Exemption form for low and moderate-cost single-family housing.
Effective April 1, 2024

Temporary Building Guideline (CE1093)

Permit guide for temporary buildings (< 180 days)

Updated February 2024

Commercial Minor Repair Spec List (CE1112)

This form is to be completed by the applicant to obtain a minor repair permit for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.

Updated: 05/17/2022

Electronic Lock Plan Submittal Checklist (CE1337)

Checklist of plan review requirements for electronic locks.

Last updated: 11/18/2019

Impact Fee Service Unit Equivalent Table (UA005)

Service unit equivalent table for determining impact fees. (form UA005)

Last updated: May 20, 2021 

Care Facilities Worksheet (CE1108)

To assist in correctly identifying the intended occupancy Group of care facilities, the facility owner shall provide a completed, sign and notarized worksheet with all applications submitted for building permit, plan review, or occupancy inspection.

Updated: 10/10/2019

Deferred Submittal Request Form (CE1086)

Request for deferred plan submittal.

Last updated: 03-23-2022

Commercial Reroofing Only Worksheet (CE1076)

For reroof only commercial projects. 

Last updated: April 2024