Use a mixture of filters or keywords to find documents and resources by department, type or topic.

WCR Application Fee Schedule (UA0011)

Fee schedule for vacant land

Last updated: 01/01/2025

Tenant Listing Form (UA010)

List of vacant and occupied spaces in a shopping center.

Last updated: 10.25.2019. This document is maintained by Utility Analysis.

Wastewater Capacity Reservation Name Transfer Application (UA003)

Transfers capacity to a new property owner. (form UA003)

Last updated: 10.25.2019. This document is maintained by Utility Analysis

Standard details for elevated residential foundations

Standard details for joint City/County low cost and innovative residential foundation systems for elevated homes. The submitted plans must identify which one of the systems in the standard designs will be utilized for their project.

 

Last updated: August 2020

Single Family Residence Checklist - 2021 IRC (CE1132)

The following are some of the basic or frequently overlooked code requirements that must be detailed on plans for Single Family Dwellings and may be useful as a checklist for the designer.

Last updated: 01/09/2024

Wastewater Capacity Reservation Site Transfer Application (UA004)

Transfer capacity to another site within the same treatment plant. (form UA004)

Last updated: 07.20.2019. This document is maintained by the Utility Analysis.

Residential Prerequisite Checklist (CE1301)

New single-family residential plans must be submitted with this checklist in order for plans to be considered as complete for the purpose of plan review.

Last updated: August 2, 2024
 

Residential Plan Review User GUide (English)

Last Updated: August 2024

Impact Fee Administration WCR_Presentation_11.19.2024

This presentation was delivered at the Houston Permitting Center Annual Workshop on November 19, 2024.

Updated: 11.19.2024

22-10-R Wood Shade Structure

Revised 01/17/2023