Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Commercial Prerequisite Checklist (CE1105)

Complete and attach this form to each plan set. Commercial plans must be submitted with this form in order for your plans to be considered as complete for the purpose of plan review.

Updated: October 4, 2024

Small Meter Permit Requirements

Procedures for obtaining a small water meter.

Last updated: June 7, 2022

Commercial Minor Repair Spec List (CE1112)

This form is to be completed by the applicant to obtain a minor repair permit for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.

Updated: 05/17/2022

Easement Survey Checklist

Checklist for obtaining approval on easement surveys.

Updated: November, 2025.

Fire Access Gate Checklist

Last Update: 5/21/2024

Sewer Main or Lateral Application

Permit application for the construction of a sanitary sewer main or lateral taps to manholes.

Commercial Building Plan Review User Guide (English)

Last Updated: August 2024

Form 584 - Water Meter Easement Dedication

Easement dedication form for water meters (Form 584)

Large Meter Permit Requirements

Permitting requirements and procedures for obtaining large water meter permits.

Last updated: 10/14/2021

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017