Wastewater Capacity Reservation Revisions

HPWUA1005
Plan Review
Required
Inspection
Not Required
Renewal
Not Required
Fee
varies (See Conditions & Exceptions)
Valid Period
Water: 1 year w/fees paid; Wastewater: 6 months with unpaid fees; WW conditional: 3 months w/unpaid fees
Processing Time
up to 10 business days
APPLY QUESTIONS
Houston Public Works

1002 Washington Ave., 3rd floor
Houston, TX 77002

8 am to 3 pm

About

A revision request can be made if you believe that in your letter you need to:

  • Change the points of connection for wastewater and/or water
  • Change of site address
  • Change review of Joint Referral Committee (JRC) or Community Sewer Requirements
  • Request Private Water Well Connection
  • Request Private Septic Connection

Revision requests can only be made by the owner or agent of the original letter. If the agent has changed an updated Agent Authorization form must accompany the application. 

Conditions & Exceptions

Disqualifications

The below request requires a new Wastewater Capacity Reservation (WCR) application to be completed and do not qualify as a revision request:

  • Change of development
  • Change of square footage, occupants, number of beds, number of bowls, number of carwashes, courts, lanes, machines, Hotel/Motel rooms, seats, number of services, number of mobile home spaces, number of stations, number of swimmers, number of toilets, number of units (apartments), number of recreational vehicles.
  • Change of ownership
  • Change of legal description
  • Change of Impact Fees
  • Expired Letter

 

Who can submit a request

Revision requests can only be made by the owner or agent of the original letter. If the agent has changed an updated Agent Authorization form must accompany the application.

Revision requests will follow our standards of the current Infrastructure Design Manual.

 

Fees

  • Water: $790.55 per service unit
  • Wastewater: $1,199.11 per service unit
  • Application fee schedule
What You Need

All revision request applications must be accompanied with:

  • Copy of Wastewater Capacity Reservation (WCR) Letter
  • Impact Fee Receipts
  • Utility Site plan & Survey
  • Plan and Profile Drawings and City of Houston Drawing No. (for all points of connection requests)
  • Additional documents needed to review your request (Joint Use Maintenance Agreement, Private or Public Easement Deeds, etc.)

File sizes cannot exceed 5 MB.


Apply Online

All revision request forms and attachments must be submitted to [email protected]. Note: file sizes cannot exceed 5 MB.

Conditions & Exceptions

Revision requests can only be made by the owner or agent of the original letter. If the agent has changed an updated Agent Authorization form must accompany the application.

Revision requests will follow our standards of the current Infrastructure Design Manual.