Use a mixture of filters or keywords to find documents and resources by department, type or topic.
02083-02 5'-0 to 8'-0 Diameter Fiberglass Manhole
02534-01 Service Reconnection For Liner Pipe
02082-04 Pile Supported Manhole For Unstable Subgrade
02091-01 (2020 Detail)
2020 Detail for 02091-01 Non-Metallic Manhole Frame and Cover
02091-01 Non- Metallic Frame and Cover
2021 Detail for 02091-01 Non-Metallic Frame and Cover (effective October 1, 2021)
Last updated: July 6, 2021
02083-03 Fiberglass Manhole With Cast-In-Place Base
02082-02 4'-0" Diameter Precast Concrete Manhole
Sprinkler Go-to-Work Permit Guideline (CE1260)
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2023
02082N-03 5'-0 to 8'-0 Diameter Precast Concrete Manhole Notes
02083N-01 4'-0 Diameter Fiberglass Manhole Notes