Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 1/1/2016

Non-Licensed User Guide

How-To Guide for Non-Licensed User Accounts

Transient Meter Forms for CIP Projects

Application forms for transient meters on capital projects only (CIP projects).

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Emergency Responder Radio Coverage Guideline with Example (CE1350)

Permitting and plan review guideline for EERC with example inspection report.

Last updated: 11/25/2019

Water Main Extension Procedure

Procedures for obtaining water main extension permit.

Last updated: 1/1/2019

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Water Main Abandonment Procedure

Procedures for obtaining a water main abandonment permit.

Last updated: 1/1/2019