Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

Manufactured Homes brochure (CE1289)

This guide provides the requirements for the placement and reconnection of manufactured homes.

Last updated: 5/3/2017

TxDOT Water Details
Substantial Damage Determination Request Form

Substantial Damage Determination Request Form.

Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.

Rules for Waiver Request for the Temporary Placement of Manufacture Home due to Harvey (CE1322)

Rules for a waiver request for the temporary placement of a manufactured home or recreational vehicle on a residential property due to damage from Hurricane Harvey.

Last updated: 2/14/2018

Sidewalk Panel Completion

Notice of completion for sidewalk panel replacement work.

Chapter 19 Floodplain Guidelines

Chapter 19 Floodplain Guidelines.

House Moving brochure (CE1290)

Permitting and inspection information for house moving.

Last updated: 1/1/2016

TxDOT Sanitary Sewer Details