Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Lock Out/Tag Out Procedure for Temporary Electrical Utility Releases (CE1257)

This policy is to identify additional procedures required to be performed by the electrical contractor/master in an effort to ensure the safety of personnel at the job site.

Last updated 07/14/2020

Manufactured Homes brochure (CE1289)

This guide provides the requirements for the placement and reconnection of manufactured homes.

Last updated: 5/3/2017

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

TxDOT Water Details
Substantial Damage Determination Request Form

Substantial Damage Determination Request Form.

Sidewalk Panel Replacement Guide

Sidewalk Panel Replacement Guide.

Registration Process for State Air Conditioning Licenses (CE1308)

Registration & Renewal Process for State Air Conditioning Licenses.

Last updated: 09-01-2021

2147 Prerequisites Plan Procedures

Prerequisites Plan Procedures.

Application Form for Plan Review

Application Form for Plan Review

Sidewalk and Roadway Obstructions and Impairments Ordinance Rules and Regulations

Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance