Use a mixture of filters or keywords to find documents and resources by department, type or topic.
2020 Detail for 02091-01 Non-Metallic Manhole Frame and Cover
2021 Detail for 02091-01 Non-Metallic Frame and Cover (effective October 1, 2021)
Last updated: July 6, 2021
Guidelines for opening and using an advance pay account (APA).
Last updated: May 9, 2023
By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.
Last updated: 01-01-2023