Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Guidelines for a successful mylar walk through.
Last updated: 12/6/2019
In an attempt to reduce the number of plan submittals, the following items are required in the construction documents for all Residential Site Improvement projects.
Last updated: 10/15/2019
Permitting, plan review and inspection guidelines for electric vehicle charging station.
Last updated: 10/22/2019
Summary of Sidewalk and Roadway Obstructions and Impairments Ordinance
This guide outlines the permit and the plan review process associated with erecting scaffolding and other structures to serve as pedestrian protection during construction, repairs, and demolition projects.
Last updated: 01-01-2022
City of Houston, Texas, Ordinance Number 2007-777. An ordinance amending the City of Houston Fire Code relating to administrative fees.
Extraterritorial Jurisdiction “ETJ” is all unincorporated territory extending 5 miles beyond the corporate boundaries of the city limits of Houston as established by Chapter 42 – Texas Local Government code.
Last updated: 01/01/2022
Permitting and plan review guideline for EERC with example inspection report.
Last updated: 11/25/2019
The Residential One-Stop Guideline lists the various requirements for plan submittal and review of residential construction projects.
Last updated: 04/28/2022