Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Letter of Map Change Process

Workflow diagram of the letter of map change process for CLOMR, LOMR-F, and LOMA.

Last updated: July 22, 2019

Mitigation Frequently Asked Questions

Frequently asked questions about mitigation in the floodplain.

Code Change Proposal Example 2

Second example of a completed code change proposal form.

Multi-Family Habitability Article IV
Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2023

FIA 2021
Repairing Flood Damage Fact Sheet

Quick reference guide to flood damage repairs in the floodplain.

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Conveyance Zone Frequently Asked Questions

List of frequently asked questions about conveyance zones.

2016 Floodplain Management Plan