Use a mixture of filters or keywords to find documents and resources by department, type or topic.
This form is to assist in the plan review, permit and inspection process for those properties that have been required by the Airport Land Use ordinance to meet sound attenuation requirements. This form is to be completed by the designer or builder to ensure that either the prescriptive code requirements are met or an approved assembly is utilized to meet the requirements in the building code.
Last updated: March 2024
Application to request the Building Official's approval for a proposed temporary building (< 180 days)
Updated April 2024
This form is to be completed by the applicant to obtain a minor repair permit for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.
Updated: 05/17/2022
Last updated: 10/09/2019
Request for deferred plan submittal.
Last updated: 03-23-2022
Last updated: 5/9/2018
For reroof only commercial projects.
Last updated: April 2024
When a fill or excavation permit is required, two sets of drawings must be provided that will clearly show the proposed scope of work and include the existing site elevations and the proposed site elevations.
Last updated: 10/10/2019
This form is to be completed by the applicant to obtain permits for work that does not require a plan review provided the materials match or are equivalent to the materials being repaired or replaced.
Updated: April 2024
The code provisions applicable to facilities with hazardous materials, high hazard and high-piled combustible storage depends on the type of products (commodities) stored and the arrangement and height of the storage.
Last updated: 5/11/2018