Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Code Change Proposal Example 2

Second example of a completed code change proposal form.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2022

Code Change Proposal Example 1

Example of a completed code change proposal form.

Roof Repair and Cool Roof Guidelines (CE1209)

The 2015 Houston Commercial Energy Conservation Code with local Amendments, effective December 9th, 2016, contains mandatory cool roofing provisions for new commercial buildings and alterations to existing commercial buildings.

Updated: 10/16/2019

Pipeline Permit Procedures

Procedures for permitting pipeline street crossings and application checklist. 

Last updated: March 2019

Procedures for Contractor Name and Address Change (CE1211)

Procedures for requesting a contractor name change or address change on an existing building permit.

Last updated  09-20-2022