Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Code Change Proposal Example 2

Second example of a completed code change proposal form.

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2023

Code Change Proposal Example 1

Example of a completed code change proposal form.

Pipeline Permit Procedures

Procedures for permitting pipeline street crossings and application checklist. 

Last updated: March 2019

Pipeline Questionnaire

Questionnaire to be submitted with applications for new or existing pipelines.

Last updated: March 2019

Procedures for Contractor Name and Address Change (CE1211)

Procedures for requesting a contractor name change or address change on an existing building permit.

Last updated 01/01/2023