Developer Payment Bond - Non DPC

Developer payment bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Water Main Offset Procedure

Procedures for obtaining a water main offset permit. 

Last updated: 1/1/2019

Sewer Main Extension Procedure

Procedures for obtaining a permit for lateral sanitary sewer main extension.

Last updated: 8/1/2018

Surface Restoration Bond

One year surface restoration bond - informal contract

This document is maintained by Taps & Meters.

Commercial Service Application

Application for establishing a commercial water and wastewater billing account with Customer Account Services. 

Last update: 01/04/2021

Wastewater Capacity Reservation Site Transfer Application (UA004)

Transfer capacity to another site within the same treatment plant. (form UA004)

Last updated: 07.20.2019. This document is maintained by the Utility Analysis.

Developer Performance Bond - Non DPC

Developer performance bond as required by City of Houston Code Sec. 47-163. This is for non-Developer Participation Contract (DPC) projects.
Last update: 07/24/2020.
This document is maintained by Taps & Meters.

Fire Hydrant Installation and Relocation Procedure

Procedures for obtaining a permit to install or relocate a fire hydrant.

Last updated: 7/1/2017

Transient Meter Forms for CIP Projects

Application forms for transient meters on capital projects only (CIP projects).

Sewer Tap Permit Procedure

Procedures for obtaining a sanitary sewer tap permit.