Use a mixture of filters or keywords to find documents and resources by department, type or topic.
Form required to register as a COH Approved Special Inspector.
Last updated: 04/19/2024
This form shall be completed and submitted to the field inspector for the following residential projects: new construction, additions, complete remodels (all interior walls and ceilings are removed, or home square footage is changed ), and complete new ac systems.
Last Updated: 01/01/2023
Payment form for electrical, mechanical, and plumbing overtime inspection
2021 Detail for 02091-01 Non-Metallic Frame and Cover (effective October 1, 2021)
Last updated: July 6, 2021
Form required to register or renew electrical licenses.
Last updated: January 2024
Project cost estimate worksheets for if an owner is doing work with or without a contractor.
When the Residential Energy Code requires energy testing (air leakage and duct leakage tests), the results must be documented using this form. The testing must be done by an independent third party energy technician registered with the City of Houston. The results will need to be submitted to the Mechanical Inspector at the final inspection. If more than 3 systems are installed, please fill out an additional form.
Last updated: 01-30-2024
Form required to registered as an Independent Third-Party Energy Technician.
Last updated: January 2024
Form required to be completed to register or renew a State Air Conditioning License with the City of Houston.
Last updated: February 2024