Use a mixture of filters or keywords to find documents and resources by department, type or topic.
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
General prerequisite requirements for plan review. This form must be completed by the sign contractor.
Last updated: February 2, 2022
The following drawing is an example of typical construction and can be used as a reference.
NOTE: This is not an engineered drawing.
To provide a means for expediting the plan review of large commercial design projects prepared by professional (licensed architect/engineer) designers, and which are ready for final plan re-submittal for minimal corrections. A paid review meeting may be scheduled to review corrections for permit issuance
Last updated: 08-02-2023
Drawings may be used to document a 1-hour fire rated exterior wall design for wood framed structures located less than 5-feet to the property line after the effective dates of the adopted 2015 IBC and IRC codes.
Rev 1/17/2023
Beginning June 6, 2012 all new construction plans will require the following items to be clearly identified on the site plan to demonstrate foundation elevation compliance.
Last updated: 6/6/2016
The template drawing is to assist in the preparation of plans for residential remodeling and addition projects
Projects within the right-of-way or public utilities easement.
Building permit requirements and information about carports
This document includes the following:
- Requirements
- Off Street Parking
- Landscape Analysis Form
- Non-single Family Residential