Use a mixture of filters or keywords to find documents and resources by department, type or topic.

Easement Reverter Flowchart

Easement Reverter Flowchart. 
This document maintained by the Joint Referral Committee.

Commercial Elevator Permit Application (CE1331)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: 03/08/2024

Residential Elevator Permit Application (CE1332)

For installation, relocation or alteration of Elevators, Dumbwaiters, Moving Walks, Chairlifts, Escalators, Manlifts, Wheelchairlifts, Personnel Hoists.

Last updated: 03/08/2024

Live-Work Program (CE1277)

This guide provides an overview of the qualifications and submittal requirements for projects that wish to establish a Live-Work unit through the Occupancy Inspection Section.

Last updated: 2/13/2019

Easement Reverter Application

Application to revert an easement to the property owner.

Last updated: May 25, 2022

Request For Acknowledgment Of Easement Reverter

Request For Acknowledgment Of Easement Reverter.
This document maintained by the Joint Referral Committee.

Occupancy Inspections for Existing Buildings (CE1278)

This guide provides the qualifications and submittal requirements for requesting a Certificate of Occupancy for existing buildings.

Last updated: 2/12/2019

Easement Reverter Guidelines

Easement Reverter Guidelines.
This document maintained by the Joint Referral Committee.

Overview of the General Commercial Permit Process (CE1279)

This brochure is intended to provide a very high level overview of the commercial building permit process.

Last updated: 1/1/2019

Sprinkler Go-to-Work Permit Guideline (CE1260)

By state law, sprinkler plans must be designed by a licensed sprinkler contractor. Typically, the sprinkler contractor is selected by the general contractor after the construction documents have been submitted for permit or the building permit has been issued. As a result, sprinkler drawings are designed and submitted after the building plans are reviewed and construction has commenced.

Last updated: 01-01-2024